<link rel="stylesheet" href="styles.f3b1fba60ec7970c.css">

Analisis Penjadwalan Ulang Proyek Denagan Menggunakan Metode Project Evaluation and Revier Tencnique (part)

dc.contributor.authorGini, Garcinia
dc.date.accessioned2019-08-06T06:43:40Z
dc.date.available2019-08-06T06:43:40Z
dc.date.issued2019-05-10
dc.description.abstractProjects generally have a deadline, meaning that the project must be completed before or at the specified time. Regarding project problems, the success of the project implementation on time is an important goal for both project owners and contractors. In the implementation of the project often occurs in some jobs that do not go according to plan, for example in the implementation of the construction project of Type B RSUD Magelang on foundation work and the structure has some delay in the completion of work The delay is influenced by several factors. There are several project scheduling techniques, one of which is the PERT method. PERT (Project Evaluation and Review Technique) is a project scheduling method based on networks that requires three presumptive times for each activity, namely, optimistic (a), pessimistic (b), and most likely (m). Based on the results of the analysis and calculations that have been made, the time needed to carry out the foundation work to the project structure work is 301 days. In the time schedule for the existing project plan, it takes 217 days with the possibility of a project probability of 22.06%. This is likely the probability of the project to be completed with a target of 217 days and a probability of 22.06% the possibility of the work being completed is very low. Calculations made using the PERT method have considered the possibilities that will occur at the time of implementation, possibly good or bad.en_US
dc.description.sponsorshipFitri Nugrahenien_US
dc.identifier.urihttp://hdl.handle.net/123456789/14949
dc.publisherTeknikSipil dan Perencanaanen_US
dc.subjectProject schedulingen_US
dc.subjectPERTen_US
dc.subjectProject Duration.en_US
dc.titleAnalisis Penjadwalan Ulang Proyek Denagan Menggunakan Metode Project Evaluation and Revier Tencnique (part)en_US
dc.typeThesisen_US

Files

Original bundle

Now showing 1 - 5 of 18
Loading...
Thumbnail Image
Name:
01 cover.pdf
Size:
938.45 KB
Format:
Adobe Portable Document Format
Description:
Pdf
Loading...
Thumbnail Image
Name:
01.0 cover.jpg
Size:
1.53 MB
Format:
Joint Photographic Experts Group/JPEG File Interchange Format (JFIF)
Description:
jpg
Loading...
Thumbnail Image
Name:
02 preliminari.pdf
Size:
2.05 MB
Format:
Adobe Portable Document Format
Description:
Pdf
Loading...
Thumbnail Image
Name:
03 daftar isi.pdf
Size:
1.02 MB
Format:
Adobe Portable Document Format
Description:
Pdf
Loading...
Thumbnail Image
Name:
04 abstract.pdf
Size:
10.49 KB
Format:
Adobe Portable Document Format
Description:
Pdf

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: