Performance Evaluation Of Trans Jogja Bus (Case Study: Trans Jogja Bus Line K1J)
Files
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
DOI
Abstract
Yogyakarta’s population only continues to grow as time goes by, the needs of public transportation escalate. Trans Jogja Bus Line K1J is a new route that reaches a wider area of Yogyakarta. The evaluation of Trans Jogja Bus performance and the vehicle operational cost has to be done in order to obtain data with the purpose of concluding its feasibility. This research used the requirements set by World Bank to find the value of load factor, headway, speed, and waiting time. The vehicle operational costs determined based on the Decree of the Ministry of Transportation Number 251 of 2022 and the financial analysis used the Benefit Cost Ratio (BCR) method. The results of performance evaluation obtained of load factor was 7.22%. The value of average headway was 8.95 minutes. The value of average speed was 21.89 km/hour. The value of average waiting time was 4.74 minutes. The value of vehicle operational costs was Rp 10.457,29/km. The results for financial analysis with BCR method were not feasible because the BCR < 1 with the value obtained of 0.077. The fare evaluation was carried out to find out how much fare required so that the BCR > 1, with the results of Rp 46.865,91/passenger.