<link rel="stylesheet" href="styles.f3b1fba60ec7970c.css">

Feasibility Study Using Simulation Based Net Present Value Analysis (Case Study in Kopen Coffee, Yogyakarta)

dc.Identifier.NIM13522016
dc.contributor.advisorMuhammad Ridwan Andi Purnomo, Ph.D.
dc.contributor.author13522016 Khairesa Handayu
dc.date.accessioned2021-07-08T02:07:48Z
dc.date.available2021-07-08T02:07:48Z
dc.date.issued2020
dc.description.abstractCoffee is one of the biggest commodities in Indonesia, along with rubber and textile. Nowadays, there are many coffee shops that established and this also in-line with the number of demands that increasing in Indonesia from period of 2018/2019 to 2019/2020. Luckily, Indonesia is the fourth biggest countries producing coffee beans after Brazil, Vietnam, and Colombia. Lots of people investing their money in coffee shop business. In Yogyakarta itself, coffee shop can be found in every inch of steps. One of the coffee shops in Yogyakarta that already established is Kopen Coffee. It is located in Condongcatur, where there are quite lots of undergraduate students lived and also one of densely populated area in Yogyakarta. With the competition and lots of people who invested and interested in this kind of business, this research would like to know the worth of the money invested in Kopen Coffee as well as the other similar business using Net Present Value (NPV) method that simulated using Monte Carlo. From the calculation that has been done, it is shown that the NPV of Kopen Coffee generates positive value, which is equal to Rp 336,506,243.61. From this result, it can be indicated that this project is feasible to run. After 1000 times of iteration, the NPV shows average of Rp 287,411,388, with mean standard error Rp 3,956,371. While the probability if the NPV is less than zero is 0.08%.en_US
dc.identifier.urihttps://repository.uii.ac.id/handle/123456789/30229
dc.publisherUniversitas Islam Indonesiaen_US
dc.subjectFeasibility studyen_US
dc.subjectfinancial aspecten_US
dc.subjectMonte Carloen_US
dc.subjectNet Present Valueen_US
dc.titleFeasibility Study Using Simulation Based Net Present Value Analysis (Case Study in Kopen Coffee, Yogyakarta)en_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
13522016 Khairesa Handayu.pdf
Size:
2.72 MB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: