<link rel="stylesheet" href="styles.f3b1fba60ec7970c.css">

Determination Standard Time of Stitching Line Process

Loading...
Thumbnail Image

Date

Journal Title

Journal ISSN

Volume Title

Publisher

Universitas Islam Indonesia

DOI

Abstract

Time is the necessary element in the process rate. Whether the motion time or the production rate, this element is taken care in any process in a company. When there is no standard time, any task could be finished out of planned. The time standard is determined to know the time required the process to be finished. It provides a yardstick for measuring work content and a unit for stating capacity. It is also used in loading and scheduling. In this study when was conducted on March 2014-May 2014, determined the standard time of stitching line process by using micro-motion study method which concerned about motion analysis using Methods-Time Measurement. With the application of Methods-Time Measurement, the motion analysis will be more detail which analyzes any manual operation or method into the basic motions required to perform and assigns to each motion which is determined by the nature of motion and the conditions under which it is made. By adding the percentage of allowance in worker performances, the result of standard time for stitching line process is equal to 1.6835 minutes with estimate production is 285 pairs per day. Standard time can be used as a tool to determine output capacity in order to estimate production plans and cost.

Description

Citation

Endorsement

Review

Supplemented By

Referenced By