<link rel="stylesheet" href="styles.f3b1fba60ec7970c.css">

Perbandingan produktivitas tenaga kerja ketika terjadi tundaan dengan ketika tundaan diminimalisir pada pekerjaan pemasangan granit

dc.contributor.authorRahmawati, Reni
dc.contributor.authorNugraheni, Fitri
dc.date.accessioned2025-06-04T08:29:10Z
dc.date.available2025-06-04T08:29:10Z
dc.date.issued2024-07-26
dc.description.abstractProductivity in construction projects is measured by fieldwork effectiveness. Delays such as chatting or smoking can reduce productivity and ultimately affect the overall volume and value of the work. Therefore, it is important to avoid non-productive activities during project execution Productivity in construction projects is measured by the effectiveness of fieldwork. Delays such as chatting or smoking can reduce productivity and ultimately affect the overall volume and value of work. Therefore, it is important to avoid unproductive activities during the execution of construction projects. The research was carried out by means of direct observation in the field at the granite installation workman with a size of 15x60 cm in the Student Dormitory project of Muhammadiyah University of Yogyakarta. The method used in this research is the MPDM method or Method Productivity Delay Model.The results of the data analysis that has been carried out obtained the difference between the overall productivity and the ideal in the handyman with a delay of 0.858 m2/hour with a percentage comparison of 75.608%, while when the delay is minimized, the difference is 0.278 m2/h with a percentage comparison of 92.706%. In the overall productivity of builders with a delay of 2.660 m2/h then after the delay is minimized the productivity of builders becomes 3.531 m2/h, so that the overall productivity of granite installers increases by 32.745%.en_US
dc.identifier.issn2962-2697
dc.identifier.urihttp://hdl.handle.net/123456789/56158
dc.language.isootheren_US
dc.publisherUniversitas Islam Indonesiaen_US
dc.subjectProduktivitas Granit Tundaan MPDMen_US
dc.titlePerbandingan produktivitas tenaga kerja ketika terjadi tundaan dengan ketika tundaan diminimalisir pada pekerjaan pemasangan graniten_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
cereform 7 prosiding-198-207.pdf
Size:
261 KB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections