<link rel="stylesheet" href="styles.f3b1fba60ec7970c.css">

Analisis tingkat keandalan Bendungan Bendo Ponorogo

dc.contributor.authorSetiawan, Mokhammad Zaki
dc.contributor.authorAstuti, Sri Amini Yuni
dc.date.accessioned2025-06-09T08:29:30Z
dc.date.available2025-06-09T08:29:30Z
dc.date.issued2024-02-07
dc.description.abstractPopulation growth which increases every year affects water demand, resulting in an imbalance between water availability and water demand. With the construction of the Bendo Dam, it is hoped that it will be able to accommodate river flow and rainwater that falls on the dam so that it can be used to meet the irrigation water needs of rice fields and the community's raw water needs throughout the year.This calculation includes hydrological analysis, dam characteristics analysis, water availability analysis using the F.J. Mock, water demand analysis and reliability analysis. Dam reliability analysis is obtained from water balance simulations and the dam's level of reliability to serve the community's water needs.The dam storage capacity is 43,114,234.00 m3 with live storage of 33,938,148.00 m3 and dead storage of 9,176,086.00 m3.The level of reliability of the Bendo Dam to meet raw water needs with 10 years projection until 2031 and irrigation water needs with a rice field area of 3299 ha obtained an average level of reliability of 26.69%.. The average level of reliability is still very low, only part of it can be served, so optimization needs to be done to get a reliability level of 100%. The optimization level of reliability is obtained if the water requirement is only to serve the projected raw water needs for 2031 with a population of 230,154 people in 3 sub-districts (namely Sawoo Subdistrict, Mlarak Subdistrict, and Badegan Subdistrict), and serving irrigation needs with a rice field area of 600 haen_US
dc.identifier.issn2962-2697
dc.identifier.urihttp://hdl.handle.net/123456789/56299
dc.publisherUniversitas Islam Indonesiaen_US
dc.subjectDam, Water availability, Water balance, Level of reliabilityen_US
dc.titleAnalisis tingkat keandalan Bendungan Bendo Ponorogoen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Proceeding The 6th CeReform Final-419-428.pdf
Size:
325 KB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections