PERBANDINGAN WAKTU DAN BIAYA PROYEK ANTARA JAM KERJA LEMBUR DAN PENAMBAHAN TENAGA KERJA PADA PEKERJAAN STRUKTUR ( Studi Kasus : Perumahan Mukti Sendangadi Residence ) COMPRASION OF PROJECT TIME AND COST BETWEEN OVERTIME AND ADDITIONAL EMPLOYEES ON STRUCTURAL WORK ( Case Study : Mukti Sendangadi Residence )
| dc.contributor.advisor | Dr. Ir. Tuti Sumarningsih., M.T. | |
| dc.contributor.author | Ardattiyan Dwi Irianto, 12511341 | |
| dc.date.accessioned | 2019-03-20T02:29:40Z | |
| dc.date.available | 2019-03-20T02:29:40Z | |
| dc.date.issued | 2019-02-14 | |
| dc.identifier.uri | https://repository.uii.ac.id/handle/123456789/14246 | |
| dc.publisher | Universitas Islam Indonesia | en_US |
| dc.title | PERBANDINGAN WAKTU DAN BIAYA PROYEK ANTARA JAM KERJA LEMBUR DAN PENAMBAHAN TENAGA KERJA PADA PEKERJAAN STRUKTUR ( Studi Kasus : Perumahan Mukti Sendangadi Residence ) COMPRASION OF PROJECT TIME AND COST BETWEEN OVERTIME AND ADDITIONAL EMPLOYEES ON STRUCTURAL WORK ( Case Study : Mukti Sendangadi Residence ) | en_US |
| dc.type | Undergraduate Thesis | en_US |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- TUGAS AKHIR ARDATTIYAN DWI IRIANTO.pdf
- Size:
- 3.97 MB
- Format:
- Adobe Portable Document Format
- Description:
License bundle
1 - 1 of 1
Loading...
- Name:
- license.txt
- Size:
- 1.71 KB
- Format:
- Item-specific license agreed upon to submission
- Description: