Analisis Biaya Dan Waktu Dengan Metode Konsep Nilai Hasil Pada Pembangunan Gedung Kebudayaan Sumatera Barat ( Cost And Time Analysis With The Yield Value Concept Method In The Construction Of Cultural Building Of West Sumatra )
| dc.Identifier.NIM | 15511282 | |
| dc.contributor.advisor | Adityawan Sigit, S.T, M.T. | |
| dc.contributor.author | YANTHIKA ESA PUTRI | |
| dc.date.accessioned | 2021-10-22T07:34:30Z | |
| dc.date.available | 2021-10-22T07:34:30Z | |
| dc.date.issued | 2021-07-18 | |
| dc.identifier.uri | https://repository.uii.ac.id/handle/123456789/33506 | |
| dc.publisher | Universitas Islam Indonesia | en_US |
| dc.title | Analisis Biaya Dan Waktu Dengan Metode Konsep Nilai Hasil Pada Pembangunan Gedung Kebudayaan Sumatera Barat ( Cost And Time Analysis With The Yield Value Concept Method In The Construction Of Cultural Building Of West Sumatra ) | en_US |