<link rel="stylesheet" href="styles.f3b1fba60ec7970c.css">

Perbandingan Biaya Pekerjaan Pelat Lantai Beton Antara Metode Konvensional Dan Pracetak Flyslab (Cost Comparison Of Concrete Floor Work Between Conventional Methods And Precast Flyslab)

Loading...
Thumbnail Image

Authors

Journal Title

Journal ISSN

Volume Title

Publisher

Universitas Islam Indonesia

DOI

Abstract

The method of implementation of construction determines the magnitude of the cost at a development work at the end of the project. This research aims to know the comparative costs of concrete plates work between conventional methods and prefabricated method flyslab The methodology of this study is to conduct a recount costs work plate concrete floors in buildings which originally planned Jongke Rusunawa using conventional reinforced concrete into concrete flyslab. The cost of the recount done by either recalculate volume of work nor the unit price work floor plates. The results of this research is that the cost of conventional methods of floor plate of work amounting to 2,002 million and flyslab methods work cost amounting to Rp 1,623 million. Where there is a comparison of the cost of the work floor plate between the conventional methods and flyslab amounting to 379. These results suggest that work on building floor plate of Jongke Rusunawa-based prototype of the T-24 which has 5 floors with method of flyslab there is a saving of 19% against conventional floor plate work.

Description

Citation

Endorsement

Review

Supplemented By

Referenced By